hpp visegrad

Bosnia and Herzegovina: HPP Visegrad’s June output drops 43% amid ongoing decline in hydropower generation

Hydropower plant Visegrad, operated by “Hidroelektrane na Drini”, a subsidiary of the power utility ERS, generated 33.74 GWh of electricity in June 2025 — a 43% decrease from May’s output of 59.11 GWh. Compared to June 2024, when the plant produced 36.25 GWh, output is also slightly lower. In 2024, the plant produced a total […]

Bosnia and Herzegovina: HPP Visegrad’s June output drops 43% amid ongoing decline in hydropower generation Read More »

Bosnia and Herzegovina: HPP Visegrad reports significant drop in May 2025 electricity production

Hidroelektrane na Drini, a subsidiary of the power utility ERS that operates the Visegrad hydropower plant, announced that the plant generated 59.11 GWh of electricity in May 2025. This represents a 48% decrease compared to April 2025, when production reached 113.76 GWh. Compared to May 2024, output was slightly higher, as the plant produced 54.02

Bosnia and Herzegovina: HPP Visegrad reports significant drop in May 2025 electricity production Read More »

Bosnia and Herzegovina: HPP Visegrad generates 113.76 GWh in April 2025, marking slight monthly decline but stronger yearly performance

A subsidiary of the power utility ERS, called Hidroelektrane na Drini, which operates the Visegrad hydropower plant, announced that the plant produced 113.76 GWh of electricity in April 2025. This is 5.4 percent less than the previous month, when electricity generation was 120.21 GWh. In April of the previous year, the plant produced 78.45 GWh

Bosnia and Herzegovina: HPP Visegrad generates 113.76 GWh in April 2025, marking slight monthly decline but stronger yearly performance Read More »

Bosnia and Herzegovina: HPP Višegrad set for major modernization project

The subsidiary company Hidroelektrane na Drini, part of Elektroprivreda Republike Srpske (ERS), has initiated a public procurement process aimed at extending the operational lifespan and improving the efficiency of the Višegrad hydropower plant. The focus of the procurement is the development of a conceptual design and a feasibility study, with an estimated contract value of

Bosnia and Herzegovina: HPP Višegrad set for major modernization project Read More »

Bosnia and Herzegovina: HPP Visegrad sees surge in electricity production in March 2025

Hidroelektrane na Drini, a subsidiary of power utility ERS and operator of the Visegrad Hydropower Plant (HPP), reported a significant increase in electricity production for March 2025. The plant generated 120.21 GWh of electricity during the month, nearly doubling its February output of 63.97 GWh. Compared to March 2024, when production reached 103.63 GWh, this

Bosnia and Herzegovina: HPP Visegrad sees surge in electricity production in March 2025 Read More »

Scroll to Top